Construction delays are seldom due to a single issue. In most cases, they work around the problem by trying to fit the smaller tools around the larger tools, for example, trying to fit the small tool around the large tool if the lift is unsuitable, or waiting for the crane that is too big to fit the lift.Â
Proper equipment selection prior to commencing work can avoid many of these delays. With a well-planned crane rental, project teams can gain the lifting power, reach, and flexibility necessary to ensure their work continues smoothly.Â
Know About the Load Before Choosing Equipment
The first step before crane rental is to know precisely what to lift. While weight is important, it is just one factor. The height, horizontal reach, lifting points, and load placement should be taken into account, as well.
A crane that can easily lift the load at a short distance may not be able to lift the same load further away. It is easier to choose the equipment that can do the job without having to make changes if these details are confirmed early on.
Select the Right Crane for JobsiteÂ
An ideal crane on paper cannot be an ideal crane for a specific site. Equipment selection can be influenced by any of the following: tight entrances, obstructions overhead, lack of staging areas, and close structures.
Think of how the crane will come in, where it will go, and how much space will be needed for it to be used. A smaller or more mobile crane may sometimes save time versus a larger crane, which could create difficult access or set-up situations.
Assess Area CapacityÂ
A common planning error is just considering what a crane can lift at its heaviest weight. The actual capacity may vary considerably with boom length, radius of operation, configuration, and other site conditions.
Compare the load chart and the actual lifting conditions to get a clear idea of what will be done before scheduling equipment. It’s a basic move that can avoid the hassle of a crane showing up for a job, only to find that the lift is too heavy for it at the required height.Â
Coordinate with Crew for Rigging and Operating
Equipment is a mere part of a successful lift. Qualified operators, riggers, signal personnel, transportation, and setup support might also need to be coordinated depending on the project. If these moving elements are not scheduled appropriately, the crane ends up sitting idle and costing money.Â
Verify delivery dates, operator, rigging requirements, permits, and site preparation before the lift date. Avoidable waiting periods can be eliminated by having clear communication between the rental provider and the project team.Â
Plan and Set Up Ground ConditionsÂ
The crane setup can easily be a time waster if it isn’t planned ahead of time. The ground must be capable of supporting the equipment and the loads involved, and the setup area must have enough clear space for safe operation of the equipment.
Before a rental, site teams need to be aware of soft ground and slopes, underground utilities and restricted areas, and possible obstructions. Mitigating these challenges early can prevent delays in site preparation at the end of the process, potentially causing delays to the entire schedule.